Bettr Manager
Docs
University
Sign in
Kitchen to Plant
›
Scaling Up
›
Choosing and Rolling Out a System
Choosing and Rolling Out a System
How to buy and implement without the 8-month onboarding disasters.
1.
Write your requirements before you shop
How to turn your own operation into a one-page requirements list — your real process, your volumes, your must-haves, and the connections you need — so vendors sell to your needs instead of to their own strengths.
2.
Evaluate a system without getting sold
How to run demos and reference calls that surface the truth about a system — scripting them around your own scenarios so a vendor cannot hide a lot-number field, an oversold integration, or a cost that only appears after you sign.
3.
Single source of truth: don't become the integration layer
How to architect your stack around a single source of truth — naming one owner for each kind of data, telling a healthy connection from a brittle one, and deciding what to consolidate versus what to merely connect — so your team stops re-keying and reconciling between systems.
4.
Roll out a new system in weeks, not months
How to run an implementation that lands in weeks instead of dragging into an eight-month ordeal — phasing the rollout around your highest-pain workflow, running your old system in parallel until the numbers reconcile, and training the floor before the switch — so the day you go live is a quiet Tuesday, not a crisis.
5.
Move your data in clean, leave the mess behind
How to move your items, recipes, lots, and balances into a new system without carrying in the duplicates, mismatched units, and untied counts that would corrupt it from hour one — cleaning the master data before it loads, proving your opening balances and open lots after, and keeping a way back if the load goes wrong.